Train Simulator Classic 2024

Train Simulator Classic 2024

New York Division-Bergen County Line
Showing 91-100 of 247 entries
< 1 ... 8  9  10  11  12 ... 25 >
Update: Feb 11, 2017 @ 9:55pm

Hotfix - Enable Super-EL track 2 West of Ramapo River, as it was disabled.
Cumulative Scenery work since upate

Update: Feb 10, 2017 @ 11:23am

Route Update Number 156
New York Division-Bergen Line 9.8.6.5: Central Valley

Additions: Deep Scenery in Town of Woodbury, Central Valley and Highland Mills New York and the Woodbury Trestle.

Fixes:
Signal Bridge with Bracket Mast West of Ramsey Rt17 change from 1 head to 2, Signal Bridge East of Glen Rock change from 2 head to 1 East bound, Signal Bridge East of Radburn change to 1 head both directions, Signal Bridge West of Rutherford change to 1 head West bond. Eastbound signal at HX Track one change from 1 to 2 head (HatTip: Singray0224 for his research)

Update: Jan 13, 2017 @ 10:18pm

Route Update Number 155
New York Division-Bergen Line 9.8.6:Travel by Train!

Additions: Resume Westward Scenery Work in Town of Woodbury and Central Valley NU.

Fixes:
Lower Track 80cm to allow for double stack clearance Marion to Croxton CP, Correct Sunken Track Fault CP Croxton to NEC, Removed Unpacked files for US Asset Pack to remove tank car and scenery that cannot be seen by some users. Corrections (H/T Singray0224) Item 7- Reduce signal head E of Secaucus Jct from 2 to 1. Item 6 - Add 1 Head Eastbound Signal to Curve E, of HX, Item 5 resolve approach at signal 10-42, extent track marker beyond switch to Curtis Wright. Item 3, Extra Track mast E. of Ramsey Rt 17, Replace Signal Bridge with Bracket Mast West of Ramsey Rt17.

Update: Jan 6, 2017 @ 6:34am

Route Update Number 154
New York Division-Bergen Line 9.8.5g:

Additions: Replace Bridge over the Passic River at Hawthorne, NJ

Fixes:
Signal Fix Sloatsburg 32-2W, Update all platform markers, Singal Fix 32-2, track break on Hillburn Xover and Hillubrn Yard Lead. Extensive signal testing at 32-2 and 31-3. Westbound entry to Suffern/Hillburn shows divergece from track 1, from track 2 entry requires SPAD. East bound ntry to Suffern/Hillburn does not show divergence by design, it shows Red/Red, entry requres SPAD which will be granted.

Update: Jan 2, 2017 @ 11:07am

ROUTE UPDATE*
Update #153
HX Signal Correction Relay Croxton Lead and remove track break, Relay Marion CP, Fix ACF Shipping Siding Marker, Correct QD Remove and replace assets on Piermont displaced by track relay. Detail Work Jersey City. Replace Jersey City QD. New Signal Masts Suffern, Re-signal Marion/Croxton CP, Add Jersey City QD, Add Signals Boonton/Orange Running Track. Recover from Track.bin failure through restore.

Update: Dec 27, 2016 @ 6:54pm

*Hot Fix Route Update Number 152
Correct track break on Piermont by Clayton Container. (JHarkness)

Update: Dec 26, 2016 @ 7:58pm

*Hot Fix) Route Update Number 151
New York Division-Bergen Line 9.8.5d: Hillburn Redeux

Additions: Add Warning signs at Signal Bridges to warn of divergence speed. Markers for Yard Offices: Croxton, Dundee and Suffern.

Fixes:
Track Break, Stuck Crossover at BT (Passaic Juncition) Replace Missing Rail on Piermont (SFC-sagefuncom) Replace signals and markers at 14-7 and 14-4

Update: Dec 24, 2016 @ 10:09pm

*Hotfix No.150*
Reinstall Embankment between BT and Broadway. Reinstall Grade Grossing Central Ave E. Rutherford. Scenery Detail at SF Tower, New Scenery Secaucus, New County Road, Modify Bridge, New Signal Bridge and Signals *confirm specifications identified by user- Extend Utility towers (Stingray0224)

Update: Dec 24, 2016 @ 11:16am

*Hot Fix* No.149
Correct Incorrect Speed at Suffern Yard Lead and at Curve by Curtis-Wright.
Mow the lawn to Garfield. Replaced signal at Mahwah. This concludes track corrections and signal rework from Croxton to Highland Mills. It took a month but we got it.
Merry Christmas from the Minermen.

Update: Dec 23, 2016 @ 10:12pm

HOT FIX: Update 148

Replace Track W of Suffern Platform to curve, relay crossover and redo signals, fencing, cars and shrubs.(Stingray0224) Correct Rail Break between Broadway and BT both tracks, Allendale Activate unselected Super El Track Between Andersen and Allendale track 2 (stingray0224-confirm REC SecPac is USAssetPack, by deslecting and selecting in blueprint) (siingray0224 - QD fix Harriman Old Main (glad to see you on the old main) to Hillburn, QD fix Croxton - Suffern, QD Fix Marion CP - Suffern)
Thanks to the route testers!