Train Simulator Classic 2024

Train Simulator Classic 2024

New Haven - Boston
Showing 31-40 of 78 entries
< 1  2  3  4  5  6 ... 8 >
Update: May 4, 2015 @ 3:24pm

This is a minor bugfix update.

*Resolved a signalling issue if heading westbound on a Shore Line East commuter train. Due to the departure time of a Northeast Regional from New Haven, the signal at Old Saybrook would be a perpetual stop signal until that Northeast Regional has passed (would have been a long wait).

Update: May 4, 2015 @ 3:10pm

This is a minor bugfix update.

*Resolved a signalling issue if heading westbound on a Shore Line East commuter train from Old Saybrook. A freight consist was causing a persistent stop signal for the train.

Update: May 4, 2015 @ 12:21pm

This is a content update.

*Added some AI (Artificial Intelligence) train consists to the route. When you are playing a quick drive, Northeast Regional consists will pass you on your journey between New Haven and Boston. Additionally, there are numerous freight consists scattered throughout the route.

NOTE: When selecting season, weather, and time for the Quick Drive, keep the time at 12:00 if you want the trains to move. Setting the time to anything other than 12:00 will result in the trains not moving at all. I hope to have a workaround for this in the future.

Update: May 1, 2015 @ 7:25am

This is a content and bugfix update.

*Added all possible quick drives for Amtrak, Massachusetts Bay Transportation Authority, and Shore Line East. If you choose an electric locomotive, you will only be able to choose from Amtrak quick drives. If you choose a diesel locomotive, you can choose from all three rail companies.

*Added a missing signal around Clinton, CT.

*Fixed speed limits of numerous crossovers between Old Saybrook and New Haven.

Update: Apr 19, 2015 @ 2:59pm

This is a content and bugfix update.

*Created a limited set of fresh quick drives. I completely deleted the old quick drives and created these from scratch. They all include proper pathing and were personally tested by me over the past couple days. I don't expect issues, but please report them if you find any.

*Boston Back Bay station is under construction. The walls and tunnel are established as well as some preliminary lighting. I want some feedback on this. The lighting will be tweaked (right now I think it's a bit too bright in certain parts of the tunnel).

Update: Apr 8, 2015 @ 2:00pm

This is a bugfix update.

*Resolved a quick drive pathing issue with diesel locomotives between Old Saybrook and New Haven. Before this fix, trains would be routed to a freight rail near Clinton station. Now with these new pathing fixes, it will not occur.

*Minor catenary alterations at Boston South Station.

Update: Apr 5, 2015 @ 11:11am

This is a content and bugfix update.

*Added a lot more additional scenery to downtown Boston, particularly Boston South Station. This scenery includes but is not limited to: buildings, catenary, highways, road traffic, and foliage.

*Fixed signalling issues between Mill River Interlocking and New Haven Union Station. Westbound signals at Division Post in real life are supposed to be Metro North signals, but they would not work properly with the rest of the signals in the system. As such, those particular signals have been replaced with standard PL signalling.

*Implemented proper signalling at Boston South Station. This includes the stop signal at the end of each platform and the Approach Slow indication at Tower 1.

*Fixed routing at Tower 1 interlocking at Boston South Station. To test routing to all 13 tracks, users can start a Quick Drive session from Boston Back Bay and set any of the thirteen tracks as their destination.

*Fixed the curvature of the track and platform at Boston Back Bay station.

*Smoothed out an area of track between Shore Line Junction interlocking and Mill River Interlocking. This affects track 1 only. Additional work will need to be done in the future for it to be completely smoothed out.

Update: Mar 27, 2015 @ 7:33pm

This is a content update.

*Added some catenary and gantries. There is some at Boston South Station as well as between Kingston, RI and Cranston, RI. More will come in future updates.

*Began constructing the core elements of Boston South Station. The overhead partking garage and the platform canopies are the only elements added so far.

*Fixed some of the track curvature at Tower 1 Interlocking at Boston South Station. Additional fixes will occur on Cove Interlocking near Back Bay Station in a future update.

Update: Feb 16, 2015 @ 11:02am

This is a bugfix update.

*Fixed a quick drive issue that would send a player to New London Track 4 instead of New London Track 2 when starting from New Haven and heading east.

Update: Feb 16, 2015 @ 6:42am

This is a bugfix update.

*Fixed signalling issues between MP78 and New Haven.
*Fixed quick drive pathing issues.

Please report any additional bugs you encounter.