Train Simulator Classic 2024

Train Simulator Classic 2024

South London to Brighton
Näytetään 1–10 / 18
< 1  2 >
Päivitys: 10.1.2015 klo 5.16

Update 1.6 - Added AWS and TPWS to the Waterloo lines and Lines to and from West London Line (only as far as the end of international junction), Added Missing signals on International Junction (and AWS Ramps too!) and Changed Speed Limits at Clapham Junction P1 and 2 (with buffer light)

Päivitys: 7.1.2015 klo 12.59

Updates to Trackwork around purley to add a connection between purley p4 and siding

Päivitys: 4.1.2015 klo 7.15

Update 1.5 - Adds minor fixes to signals and aws ramps around Sanderstead, and terrain around horsham portal (requested)

Päivitys: 4.1.2015 klo 6.56

(Failed update - 1.5 in next update)

(This is being written about 6 years after I did this one - so can't remember )

Päivitys: 20.12.2014 klo 10.19

  • Update 1.4 - Now includes Reigate, with thanks to Richard Mills who did the section (with minor tweaks and tidying by myself - changing assets to South London Versions) and Requested - Added additional portals for those that wanted to import London - Brighton scenarios, so if in doubt use the portals labelled "Portal" :)

Päivitys: 11.12.2014 klo 12.37

(Probably related to 1.3)

Päivitys: 11.12.2014 klo 1.28

  • Update 1.3 - Minor fixes to track directionality, missing AWS ramps between Herne Hill and Tulse Hill, and added Hove Station area.

Päivitys: 8.12.2014 klo 3.50

  • Update 1.21 - Fixed Quickdrives due to them being uploaded and not appearing (not sure why)

Päivitys: 7.12.2014 klo 17.42

  • Update 1.2 - Finished Quickdrives (and added missing third rail on above crossover!)

Päivitys: 7.12.2014 klo 17.23

  • Update 1.1 - Added missing crossovers north and south of Earlswood (with Signalling and Speed signs)

Updates to Route since release
  • TS14 Characters with TS15 animations to all stations.
  • Changed Track and Track Rule to South London Network (for Scenario reasons)
  • Changed third rail to South London version (looks better)
  • Changed Vegetation to South London Network (to avoid having two different route styles and looks better!)
  • TS14 Platform Lofts with updated boundaries
  • TS15 Road Lofts
  • Collision boxes added to all stations
  • Rain and Tunnel Occulsions added to all stations
  • Updated Merstham cutting to look better. (Embankment assets to hide jagged terrain)
  • Minor fixes all along the route to improve minor bits.
  • Added disabled ramps to all stations (where appropriate)
  • Removal of distant asset block houses where appropriate )
  • Added more portals to the route