Train Simulator Classic 2024

Train Simulator Classic 2024

Not enough ratings
Cajon Pass Series - Vol. II
   
Award
Favorite
Favorited
Unfavorite
Description
Welcome back to another trip on the Cajon Pass. Click HERE to see/play the first series I did for this route over 2 years ago. Instead of re-doing a few of the scenarios from the first series I thought about just starting something fresh. You will start in the Barstow Yard and then drive a consist from Barstow to San Berardino. Also the Tehachapi Pass, Arizona Divide and the Pacific Surfliner routes are now a proud members of this series. There will be much more to do in the Cajon Pass Series - Volume II.

DLC:
ROUTES:
Tehachapi Pass
Arizona Divide
Pacific Surfliner

Scenario order (so far):
Day One:
1) Yard Work (Barstow) Part 1
1) Yard Work (Barstow) Part 1 (No SD75 Version)
2) BNSF 5723 to San Bernardino - Part 1
2) BNSF 5723 to San Bernardino - Part 1 (No SD75 Version)
3) Yard Work (Victorville)
3) Yard Work (Victorville) (No SD75 Version)
4) BNSF 5723 to San Bernardino - Part 2
4) BNSF 5723 to San Bernardino - Part 2 (No SD75 Version)
5) Yard Work (Oro Grande - Victorville)
6) BNSF 5723 to San Bernardino - Part 3
7) UP 5497 to Palmdale
8) Yard Work (San Bernardino)
9) BNSF 5723 to San Bernardino - Part 4
10) Yard Work (Barstow) Part 2
11) BNSF 5718 to Barstow - Part 1
12) Yard Work (Summit - Devore)
13) BNSF 5718 to Barstow - Part 2
14) Yard Work (UP 1346) (Tehachapi Pass)
15) Yard Work (Victorville) Part 2
16) Yard Work (Barstow) Part 3
17) UP 7162 to Barstow
18) BNSF 5718 to Barstow - Part 3
19) UP 7162 to Bakersfield - Part 1 (Tehachapi Pass)
20) Welcome to the Divide - Westbound (Arizona Divide)
21) Welcome to the Divide - Westbound: Part 2 (Arizona Divide)
22) Yard Work (Barstow) Part 4
23) UP 7162 to Bakersfield - Part 2 (Tehachapi Pass)
24) SF 534 Westbound - Part 1
25) UP 7162 to Bakersfield - Part 3 (Tehachapi Pass)
26) SF 534 Westbound - Part 2
27) SF 534 Westbound - Part 3
- - End of Day One - -

Day Two:
28) Yard Work (Bakersfield) (Tehachapi Pass)
29) Yard Work (Bakersfield) Part 2 (Tehachapi Pass)
30) UP 8625 to San Bernardino - Part 1 (Tehachapi Pass)
31) BNSF 5744 to Winslow - Part 1 (Tehachapi Pass)
32) UP 7194 assists UP 8625 (Tehachapi Pass)
33) BNSF 5744 to Winslow - Part 2 (Tehachapi Pass)
34) UP 8625 to San Bernardino - Part 2 (Tehachapi Pass)
35) Yard Work (San Bernardino) Part 2
36) SF 540 Eastbound - Part 1
37) SF 540 Eastbound - Part 2
38) BNSF 5744 to Winslow - Part 3
39) UP 8625 to San Bernardino - Part 3
40) UP 7166 to Monolith - Part 1
41) UP 8625 to San Bernardino - Part 4
42) BNSF 5744 to Winslow - Part 4 (Arizona Divide)
43) UP 7142 assists UP 7149 (Tehachapi Pass)
44) UP 7166 to Monolith - Part 2 (Tehachapi Pass)
45) SF 540 Eastbound - Part 3 (Arizona Divide)
46) UP 7166 to Bakersfield - Part 1 (Tehachapi Pass)
47) Yard Work (BNSF 6847) (Pacific Surfliner)
48) BNSF 5744 to Winslow - Part 5 (Arizona Divide)
49) UP 7166 to Bakersfield - Part 2 (Tehachapi Pass)
50) Yard Work (Darling - Flagstaff) (Arizona Divide)
- - End of Day Two - -

Day Three:
51) Yard Work (Bakersfield) Part 3 (Tehachapi Pass)
52) Yard Work (Bakersfield) Part 4 (Tehachapi Pass)
53) UP 5509 to San Bernardino - Part 1 (Tehachapi Pass)
54) BNSF 5747 to Bakersfield - Part 1 (Tehachapi Pass)
55) Yard Work (Barstow) Part 5
56) UP 5509 to San Bernardino - Part 2 (Tehachapi Pass)
57) BNSF 5747 to Bakersfield - Part 2 (Tehachapi Pass)
58) Yard Work (San Bernardino) Part 3
59) UP 5509 to San Bernardino - Part 3 (Tehachapi Pass)
60) BNSF 5747 to Bakersfield - Part 3 (Tehachapi Pass)
61) Yard Work (Tehachapi) (Tehachapi Pass)
62) UP 1351 to Bakersfield - Part 1 (Tehachapi Pass) --coming soon--
63) TBD
Items (65)
Yard Work (Barstow) Part 1
Created by RBJets
(Scenario #1 in series) Welcome to the second series for the Cajon Pass. This series will start with the forming of a freight leaving for San Bernardino later in the morning. The freight is spread out so you'll get to see a lot of the huge yard in Barstow....
Yard Work (Barstow) Part 1 (No SD75 Version)
Created by RBJets
(Scenario #1 in series) Welcome to the second series for the Cajon Pass. This one will start with the forming of a freight leaving for San Bernardino later in the morning. The freight is kinda spread out over the yard so you'll get to see a lot of the huge...
BNSF 5723 to San Bernardino - Part 1
Created by RBJets
(Scenario #2 in series) Now that your consist has been formed up by the 6744 crew you can gather up all locos needed for your trip to San Bernardino. A few units will need dropped near the pumps so the crew can top off their tanks then you'll be ready to h...
BNSF 5723 to San Bernardino - Part 1 (No SD75 Version)
Created by RBJets
(Scenario #2 in series) Now that your consist has been formed up by the 6744 crew you can gather up all locos needed for your trip to San Bernardino. A few units will need dropped near the pumps so the crew can top off their tanks then you'll be ready to h...
Yard Work (Victorville)
Created by RBJets
(Scenario #3 in series) You are now in charge of a crew in Victorville sorting out some Container wagons that are mixed in with some miscellaneous freight. After completing the marshall order you'll need to place the cut on the south sidings for "BNSF 5723...
Yard Work (Victorville) (No SD75 Version)
Created by RBJets
(Scenario #3 in series) You are now in charge of a crew in Victorville sorting out some Container wagons that are mixed in with some miscellaneous freight. After completing the marshall order you'll need to place the cut on the south sidings for "BNSF 5723...
BNSF 5723 to San Bernardino - Part 2
Created by RBJets
(Scenario #4 in series) After waiting for a northbound freight to pass you can continue towards San Bernardino. The "Yard Work (Victorville)" crew just finished placing your pickup on the south sidings. Loco: GE ES44AC BNSF - Difficulty: Easy - Length: 45 ...
BNSF 5723 to San Bernardino - Part 2 (No SD75 Version)
Created by RBJets
- - No SD75 Loco add-on Version - - (Scenario #4 in series) After waiting for a northbound freight to pass you can continue towards San Bernardino. The "Yard Work (Victorville)" crew just finished placing your pickup on the south sidings. Loco: GE ES44AC B...
Yard Work (Oro Grande - Victorville)
Created by RBJets
(Scenario #5 in series) Now you'll be working the crew up in Oro Garnde as they need to run a small cut of coal down to Victorville. After your drop you'll claim a empty formation of hoppers that will need loaded later in the day. Loco: EMD SD40-2 BNSF Her...
UP 5497 to Palmdale
Created by RBJets
(Scenario #7 in series) This scenario takes place at the same time as "BNSF 5723 to San Bernardino - Part 3". You'll be driving Union Pacific 5497 heading to Palmdale on the northern track. Loco: GE ES44AC UP - Difficulty: Easy - Length: 45 Mins Click on a...
Yard Work (San Bernardino)
Created by RBJets
(Scenario #8 in series) We jump now to the yard in San Bernardino where you will need to open up a track for "BNSF 5723 to San Bernardino" that will be coming in very soon. You'll load a cut of Containers cars and then add them to their outgoing formation....
BNSF 5723 to San Bernardino - Part 3
Created by RBJets
(Scenario #6 in series) Everything in front of you seems to have started to move south again so you can continue towards San Bernardino. Part 3 will take you down as far as Devore where you'll need to hold as now the northbound traffic is starting to stack...
BNSF 5723 to San Bernardino - Part 4
Created by RBJets
(Scenario #9 in series) Your are now clear to make a straight run into the yard in San Bernardino and off-load some rush freight then claim your return manifest back towards Barstow. Loco: GE ES44AC BNSF - Difficulty: Easy - Length: 35 Mins Click on above ...
Yard Work (Barstow) Part 2
Created by RBJets
(Scenario #10 in series) We return to Barstow to continue the long day of working this huge yard. Your next work order will include some light shop duty before heading out to place and outgoing manifest then prepping a cut of empties for sorting. Loco: EMD...
BNSF 5718 to Barstow - Part 1
Created by RBJets
(Scenario #11 in series) After arriving into San Bernardino in BNSF 5723 you coupled up to your return manifest then prepped BNSF 5718 as the lead unit. Part 1 is a long uphill run that will take you just past Summit. Loco: GE ES44AC BNSF - Difficulty: Eas...
Yard Work (Summit - Devore)
Created by RBJets
(Scenario #12 in series) BNSF 5718 has just passed you in Summit and now you can clear out the damaged Autorack that wasn't a quick fix. You will need to run it down to the waiting BNSF crew ready to fix it up. After you drop the single Autorack you'll nee...
BNSF 5718 to Barstow - Part 2
Created by RBJets
(Scenario #13 in series) After a short hold BNSF 5718 continues the trip back to Barstow. You will pull into Victorville for a drop then you will continue just a little north for a pick up in Oro Grande. Loco: GE ES44AC BNSF - Difficulty: Easy - Length: 60...
Yard Work (UP 1346)
Created by RBJets
(Scenario #14 in series) Please welcome the Tehachapi Pass to the Cajon Pass Series. The first scenario from this iconic route will start in South Mojave. You will need to form up a cut of Tankers bound to a manifest to Barstow that is waiting just up the ...
Yard Work (Victorville) Part 2
Created by RBJets
(Scenario #15 in series) You are now driving BNSF 6760 that was the helper for "BNSF 5718 to Barstow". 5718 just dropped you in Victorville to fill a Coal manifest heading north later in the day. Loco: EMD SD40-2 BNSF Heritage - Difficulty: Easy - Length: ...
Yard Work (Barstow) Part 3
Created by RBJets
(Scenario #16 in series) We return to BNSF 6744 as they will be sorting misc. empties in the east yard. Loco: EMD SD40-2 BNSF Heritage - Difficulty: Easy - Length: 50 Mins Click on above "Cajon Pass Series - Vol. II" collection link for scenario list/order...
UP 7162 to Barstow
Created by RBJets
(Scenario #17 in series) The manifest that was formed in scenario #14 on the Tehachapi Pass route has now arrived in Barstow with a load of fuel. After you drop you'll need to hook up with a fellow UP crew that will need help getting back to Bakersfield. L...
BNSF 5718 to Barstow - Part 3
Created by RBJets
(Scenario #18 in series) BNSF 5718 is ready make the final push into the west yards in Barstow. You'll drop your manifest so it can be sorted into the Hump Yard before the end of the day. Loco: GE ES44AC BNSF - Difficulty: Easy - Length: 45 Mins Click on a...
UP 7162 to Bakersfield - Part 1
Created by RBJets
(Scenario #19 in series) UP 7162 has returned from Barstow to South Mojave and will make the slow 2.0% run up the eastern part of the Tehachapi Pass with your long consist. After the eastern climb you will make your way to Cable where you'll need to hold f...
Welcome to the Divide - Westbound
Created by RBJets
(Scenario #2 in Arizona series - Scenario #20 in Cajon Pass series) Welcome back to Arizona! This time we continue this series heading West. You stop in East Flagstaff for a pickup then you'll go as far as Bellemont before you hit a red. Loco: Dash 8-40BW ...
Welcome to the Divide - Westbound: Part 2
Created by RBJets
(Scenario #4 in Arizona series - Scenario #21 in Cajon Pass series) In Part 2 SF 534 is pressing on towards Barstow. On the way you'll need to drop the F45 you picked up in Part 1. Loco: Dash 8-40BW - Difficulty: Easy - Length: 40 Mins Click on above "Ariz...
Yard Work (Barstow) Part 4
Created by RBJets
(Scenario #22 in series) BNSF 5718 has just dropped their manifest in the West Yard. You will be driving 6807 and splitting up their formation into the Hump Yard then taking a few cuts over to the East Yard. Loco: EMD SD40-2 BNSF Heritage - Difficulty: Eas...
UP 7162 to Bakersfield - Part 2
Created by RBJets
(Scenario #23 in series) UP 7162 continues now from Cable to Bealville. You'll travel around the world famous loop as you make your way west before you'll be held for more southbound manifests. Loco: AC4400CW - Difficulty: Easy - Length: 60 Mins Click on a...
SF 534 Westbound - Part 1
Created by RBJets
(Scenario #24 in Cajon Pass Vol. II series - Scenario #5 in Arizona Divide series) SF 534 has arrived in Barstow from the Arizona Divide. You'll be stopping in the Barstow Yard to replace a unit that is having some issues. After you switch out you'll conti...
UP 7162 to Bakersfield - Part 3
Created by RBJets
(Scenario #25 in series) UP 7162 will now make the final push into Bakersfield. After you arrive at the yard you'll head to the office then clock out and home for the day. Loco: AC4400CW - Difficulty: Easy - Length: 50 Mins Click on above "Cajon Pass Serie...
SF 534 Westbound - Part 2
Created by RBJets
(Scenario #26 in Cajon Pass Vol. II series - Scenario #6 in Arizona Divide series) SF 534 was held at Helendale at the end of Part 1, now you'll continue your trip towards San Bernardino as night falls. You'll make it to Summit before you are held for more...
SF 534 Westbound - Part 3
Created by RBJets
(Scenario #27 in Cajon Pass Vol. II series - Scenario #7 in Arizona Divide series) As day one of the Cajon Pass Series comes to an end SF 534 will finish their trip from Arizona to San Bernardino. You'll need to split your formation onto two seperate track...
Yard Work (Bakersfield)
Created by RBJets
(Scenario #28 in series) We start day two of the Cajon Pass Series Vol II in Bakersfield on the Tehachapi Pass. UP 7162 arrived last night and now you will need to brake up the cut of locos that made the trip. Next you'll switch out some stock for UP 8625 ...
Yard Work (Bakersfield) Part 2
Created by RBJets
(Scenario #29 in series) This scenario picks up right after the transfer of Autoracks from UP 1346 in Part 1. BNSF 6768 will also need to finish forming up a manifest for BNSF 5744 to Winslow. Then to finish your first work order of the day you'll need to ...
UP 8625 to San Bernardino - Part 1
Created by RBJets
(Scenario #30 in series) UP 1346 just added the cut of empty Centerbeam wagons to the end of your manifest and now you can head out and begin your trip to San Bernardino. Loco: EMD SD70ACe Union Pacific - Difficulty: Easy - Length: 75 Mins Click on above "...
BNSF 5744 to Winslow - Part 1
Created by RBJets
(Scenario #31 in series) The crew of 6768 claimed the cut of Autoracks from the UP 1346 crew and added them to your manifest bound to Winslow, AZ. You'll be following UP 8625 so you'll need to watch signals and hold for westbound traffic as you make your w...
UP 7194 assists UP 8625
Created by RBJets
(Scenario #32 in series) This scenario is based on something I watched on the Tehachapi Live Train Cams on YouTube. A unit in the UP 8625 manifest bound to San Bernardino has went down. You are a local crew waiting to assist any manifests in need near the ...
BNSF 5744 to Winslow - Part 2
Created by RBJets
(Scenario #33 in series) BNSF 5744 now has clearance to push past manifest UP 8625 that is waiting for a service crew. You'll proceed to Mojave as you head towards Winslow, AZ. Loco: GE ES44AC BNSF - Difficulty: Easy - Length: 85 Mins Click on above "Cajon...
UP 8625 to San Bernardino - Part 2
Created by RBJets
(Scenario #34 in series) The service crew has added unit 7194 to UP 8625's manifest and now you can continue east. You'll make the push all the way to Mojave as you head towards San Bernardino. Loco: EMD SD70ACe Union Pacific - Difficulty: Easy - Length: 8...
Yard Work (San Bernardino) Part 2
Created by RBJets
(Scenario #35 in series) This very busy second day started on the Tehachapi Pass, now we head back to Cajon Pass where the crew in San Bernardino is in the middle of loading when dispatch notifies them that they need to stage some eastbound stock. Loco: EM...
SF 540 Eastbound - Part 1
Created by RBJets
(Scenario #36 in Cajon Pass Vol. II series - Scenario #8 in Arizona Divide series) The crew in San Bernardino just finished placing stock for eastbound SF 540 to Flagstaff. You'll head north on a busy line and after the slow climb to Summit you will hold j...
SF 540 Eastbound - Part 2
Created by RBJets
(Scenario #37 in Cajon Pass Vol. II series - Scenario #9 in Arizona Divide series) After a short hold SF 540 Eastbound to Flagstaff has a straight shot into Barstow. Before you continue east you will need to hold for another eastbound exiting the yard. Loc...
BNSF 5744 to Winslow - Part 3
Created by RBJets
(Scenario #38 in Cajon Pass Vol. II series) BNSF 5744 has just arrived from the Tehachapi Pass to the yard in Barstow. Before you continue towards Arizona you'll need to drop off a small cut of Autoracks that have been assigned to Barstow. Loco: GE ES44AC ...
UP 8625 to San Bernardino - Part 3
Created by RBJets
(Scenario #39 in Cajon Pass Vol. II series) Arriving right behind BNSF 5744 from the Tehachapi Pass is UP 8625. They are heading towards San Bernardino and dispatch gave you a heads up that the eastbound manifests are a little heavy so watch your signals a...
UP 7166 to Monolith - Part 1
Created by RBJets
(Scenario #40 in Cajon Pass Vol. II series) UP 7166 is gathering empties then headed towards the Tehachapi Pass. The scenario begins in Victorville, first you will grab a cut of Cement wagons for the plant in Monolith then in Barstow a cut of empty Tankers...
UP 8625 to San Bernardino - Part 4
Created by RBJets
(Scenario #41 in Cajon Pass Vol. II series) UP 8625 will now head down the summit and into the yard in San Bernardino. Your trip will end there as the next crew will board and fuel up. You will be returning to Bakersfield with a manifest the following day....
BNSF 5744 to Winslow - Part 4
Created by RBJets
(Scenario #42 in Cajon Pass Vol. II series - Scenario #10 in Arizona Divide series) BNSF 5744 started in Bakersfield, CA and now they have arrived in Arizona. You will have a clean run until you are held in Cosnino for traffic. Loco: GE ES44AC BNSF - Diffi...
UP 7142 assists UP 7149
Created by RBJets
(Scenario #43 in Cajon Pass Vol. II series) You are a service crew just west of a Stone Freight headed to Lehigh Cement that has stalled on the loop. You'll need to tie on and pull them up the hill to Tehachapi where they will continue just down the line t...
UP 7166 to Monolith - Part 2
Created by RBJets
(Scenario #44 in Cajon Pass Vol. II series) In Part 1 you collected a cut of empty Cement Hoppers in Victorville and then a cut of Tankers in Barstow. Now you have just arrived in Mojave and you'll need to drop off the Tankers before heading to Monolith. L...
SF 540 Eastbound - Part 3
Created by RBJets
(Scenario #45 in Cajon Pass Vol. II series - Scenario #11 in Arizona Divide series) SF 540 has just arrived onto the Arizona Divide just about ten minutes behind BNSF 5744 to Winslow. You will have a drop/pickup in Williams then a quick drop in Bellemont b...
UP 7166 to Bakersfield - Part 1
Created by RBJets
(Scenario #46 in Cajon Pass Vol. II series) In UP 7166 to Monolith - Part 2 you completed your drops in Mojave and Monolith then had to hold for an eastbound freight in Tehachapi after picking up a helper that needs service in Bakersfield. Now you will con...
Yard Work (BNSF 6847)
Created by RBJets
(Scenario #47 in Cajon Pass Vol. II series) At the end of "Yard Work (San Bernardino) Part 2" BNSF 6847 was heading towards the Hobart Yard in LA to drop a cut of empty Container wagons. Now just having arrived you'll drop those cars then claim a loaded cu...
BNSF 5744 to Winslow - Part 5
Created by RBJets
(Scenario #48 in Cajon Pass Vol. II series - Scenario #12 in Arizona Divide series) The trip that started in Bakersfield will now conclude as you pull into the yard in Winslow. You'll be following another eastbound all the way into Winslow so make sure to ...
UP 7166 to Bakersfield - Part 2
Created by RBJets
(Scenario #49 in Cajon Pass Vol. II series) The trip that started in Victorville will end as you pull into the yard in Bakersfield. Loco: AC4400CW - Difficulty: Easy - Length: 65 Mins Click on above "Cajon Pass Series - Vol. II" collection link for scenari...
Yard Work (Darling - Flagstaff)
Created by RBJets
(Scenario #50 in Cajon Pass Vol. II series - Scenario #13 in Arizona Divide series) To end day two of the Cajon Pass Series we join a crew in Darling switching out some stock (as BNSF 5744 passes by, make sure to say hello) before heading to the Railhead S...
Yard Work (Bakersfield) Part 3
Created by RBJets
(Scenario #51 in Cajon Pass Vol. II series) To begin day three of the Cajon Pass Series - Vol. II you will start in Bakersfield staging a mixed southbound manifest. Some stock from the formation that UP 7166 dropped to end day two will need to be added to ...
Yard Work (Bakersfield) Part 4
Created by RBJets
(Scenario #52 in Cajon Pass Vol. II series) Day three of the Cajon Pass Series - Vol. II continues in Bakersfield. Page 2 of your work order will be to take some empties down just south of the yard and then collect both loaded and empty stock from around t...
UP 5509 to San Bernardino - Part 1
Created by RBJets
(Scenario #53 in Cajon Pass Vol. II series) The first freight out on day three is a double stack running from Bakersfield to San Bernardino. After the slow climb out of Edison you will make it to Caliente where you'll wait for a westbound coming down from ...
BNSF 5747 to Bakersfield - Part 1
Created by RBJets
(Scenario #54 in Cajon Pass Vol. II series) A BNSF double stack has been in Mojave all night getting some minor repairs and crew change. Now they are ready to head towards Bakersfield on a clear morning. Loco: GE ES44AC BNSF - Difficulty: Easy - Length: 35...
Yard Work (Barstow) Part 5
Created by RBJets
(Scenario #55 in Cajon Pass Vol. II series) At the end of Part 4 you headed off to make a run to Yermo. Now the next morning you have returned to Barstow with a cut of empty Container wagons that will need added to a manifest heading to Los Angeles later i...
UP 5509 to San Bernardino - Part 2
Created by RBJets
(Scenario #56 in Cajon Pass Vol. II series) After that westbound coming down from Bealville clears you can head out of Caliente. You will make it all the way to the famous Tehachapi Loop and hold for eastbound traffic and wait for your turn to get through....
BNSF 5747 to Bakersfield - Part 2
Created by RBJets
(Scenario #57 in Cajon Pass Vol. II series) Part 2 will take you through the famous Tehachapi Loop while holding for eastbounds on your way to your end point at Rowen. (Scenario note: While testing the signal at the loop is yellow, it should be red. Make s...
Yard Work (San Bernardino) Part 3
Created by RBJets
(NOTE: I removed the Arizona DLC from this scenario) (Scenario #58 in Cajon Pass Vol. II series) At the end of day 2 the Yard Work (BNSF 6847) crew came back from the Hobart Yard in LA with a cut of Container cars that will be part of a manifest heading to...
UP 5509 to San Bernardino - Part 3
Created by RBJets
(Scenario #59 in Cajon Pass Vol. II series) After one more westbound comes through the loop you'll be able to make it up to Monolith before being held for more traffic to proceed. Loco: GE ES44AC UP - Difficulty: Easy - Length: 45 Mins Click on above "Cajo...
BNSF 5747 to Bakersfield - Part 3
Created by RBJets
(Scenario #60 in Cajon Pass Vol. II series) As you work through traffic the trip to Bakersfield is slowly coming to an end. Part 3 will take you as far as Ilmon before you are held for a eastbound. Loco: GE ES44AC BNSF - Difficulty: Easy - Length: 50 Mins ...
Yard Work (Tehachapi)
Created by RBJets
(Scenario #61 in Cajon Pass Vol. II series) After assisting UP 5509 up to Tehachapi you have uncoupled and as they pull away you begin your duties at the Tehachapi Cement Plant. Loco: EMD GP40-2 - Difficulty: Easy - Length: 50 Mins Click on above "Cajon Pa...