Cities: Skylines II

Cities: Skylines II

View Stats:
Autodidact Oct 24, 2023 @ 8:48pm
garbage system is broken
My town has a pop of 5.3k and is generating 35t of trash. I have an upgraded recycling plant and 2 landfills and thats only enough to process about half the garbage. Each one has a 20 truck capacity but usually only 0-1 are in use at a time. Half my budget is used on trash collection and I'm hemorrhaging money.
< >
Showing 31-45 of 56 comments
¤ OpN ¤ (Banned) Oct 28, 2023 @ 10:31am 
Originally posted by Saucy Гack:
So im gonna blow you guy's mind real quick. You ready? There is a bug in the game right now where the incineration plant GENERATES trash instead of burning it. So yea... Thats why it feels like an uphill battle lol
Dude, if this is true this doubled F'd me..... I built way more incinerators trying to fix the problem....
¤ OpN ¤ (Banned) Oct 28, 2023 @ 10:32am 
Originally posted by AlienWired:
The game is not broken, your game strategy is.
Lol everyone that's played the game knows it has a lot of bugs. Please knock it off with your nonsense ignorance.
icedude94 Oct 28, 2023 @ 12:45pm 
I might have figured it out. There's garbage and there's industrial waste. The industrial waste can't be recycled or burned but gets counted in the garbage total. I have the final industrial waste processor building and all it has done is send out dump trucks to pick up garbage from my other storage sites.

Where my recycler and incinerator say "stored garbage" in the info window, the industrial waste processor says "stored industrial waste."

Still testing this out.

Update: The industrial waste processor has now stopped sending out dump trucks to gather from all my incinerators and recyclers and has sent out it's own garbage collection truck that actually says it is collecting industrial waste, not normal garbage.
Last edited by icedude94; Oct 28, 2023 @ 12:55pm
anti678 Oct 28, 2023 @ 12:52pm 
I have a 13k population city with only one incinerator plant and for whatever reason I'm having no garbage issues at all. If it is broken, I'm ok with it,
Draconas Oct 28, 2023 @ 12:57pm 
60k pop, 6 upgraded incinerators with waste budget maxed out, they'll go out once, fill then get stuck processing it until the end of time

badly imbalanced.
icedude94 Oct 28, 2023 @ 12:57pm 
Last edited by icedude94; Oct 28, 2023 @ 12:57pm
icedude94 Oct 28, 2023 @ 1:01pm 
Originally posted by Draconas:
60k pop, 6 upgraded incinerators with waste budget maxed out, they'll go out once, fill then get stuck processing it until the end of time

badly imbalanced.

Do you have the industrial waste processor built?
paulbierley Oct 28, 2023 @ 1:03pm 
Bulldoze all your garbage facility's and one of the outside city's will send garbage trucks to collect all your city's garbage and take it away for free.
Draconas Oct 28, 2023 @ 1:05pm 
Originally posted by icedude94:
Originally posted by Draconas:
60k pop, 6 upgraded incinerators with waste budget maxed out, they'll go out once, fill then get stuck processing it until the end of time

badly imbalanced.

Do you have the industrial waste processor built?
kinda stupid to expect someone to dump 8 points on end game garbage management to put a dent in it. if they're going that route they really need to go "so garbage and industrial waste are separate"

edit: built it and surprise, same behavior of getting clogged up into doing nothing and even better, you can only build 1 of them :/
Last edited by Draconas; Oct 28, 2023 @ 1:08pm
icedude94 Oct 28, 2023 @ 1:10pm 
Originally posted by Draconas:
Originally posted by icedude94:

Do you have the industrial waste processor built?
kinda stupid to expect someone to dump 8 points on end game garbage management to put a dent in it. if they're going that route they really need to go "so garbage and industrial waste are separate"

You didn't answer the question. Do you have one built? I decided to try it out because the recycling plant lets you build hazardous waste collection points as an addition to them. I don't think the incinerators are processing industrial waste either. Just a theory I'm testing so I want to see if anyone else who has the industrial waste processing site built is still having the problem.

Since I've built it, it picked up about 155 tons of industrial waste from my incinerators and recycler. It hasn't gone back since an occassionally sends out a collection truck for industrial waste that returns with very small amounts, like less than a ton.

I'm wondering that since all the waste management buildings act as warehouses for waste, if there's this hidden "industrial waste" that needs its own facility that is piling up.

People are reporting that their processing rates don't make sense and I wonder if this is why.
AlienWired Oct 28, 2023 @ 1:12pm 
Originally posted by icedude94:
Originally posted by Draconas:
kinda stupid to expect someone to dump 8 points on end game garbage management to put a dent in it. if they're going that route they really need to go "so garbage and industrial waste are separate"

You didn't answer the question. Do you have one built? I decided to try it out because the recycling plant lets you build hazardous waste collection points as an addition to them. I don't think the incinerators are processing industrial waste either. Just a theory I'm testing so I want to see if anyone else who has the industrial waste processing site built is still having the problem.

Since I've built it, it picked up about 155 tons of industrial waste from my incinerators and recycler. It hasn't gone back since an occassionally sends out a collection truck for industrial waste that returns with very small amounts, like less than a ton.

I'm wondering that since all the waste management buildings act as warehouses for waste, if there's this hidden "industrial waste" that needs its own facility that is piling up.

People are reporting that their processing rates don't make sense and I wonder if this is why.


This game has so many supply chains people think they left garbage out of it.... :steamhappy:
Last edited by AlienWired; Oct 28, 2023 @ 1:12pm
icedude94 Oct 28, 2023 @ 1:14pm 
Let's think logically for a second here. Imagine your city only has a recycling plant. It says it has "stored garbage."

Is all of that garbage recyclable?

Why are people expecting a recycling plant to handle 100% of the garbage from a small town?

How does a recycling plant process hazardous waste?
naapsuland Oct 28, 2023 @ 1:34pm 
Originally posted by Sacb0y:
How the hell did you manage that? Trash hasn't been an issue for me at all.


same here lmao
SomeoneSomewhere Oct 28, 2023 @ 1:35pm 
Originally posted by paulbierley:
Bulldoze all your garbage facility's and one of the outside city's will send garbage trucks to collect all your city's garbage and take it away for free.
It's not free, you do pay for it.
Xan84 Oct 28, 2023 @ 1:37pm 
All my incenerator plants are full, 700 processing ability and only 260 produced. I have so many buildings with the garbage sign, so frustrating...
< >
Showing 31-45 of 56 comments
Per page: 1530 50

Date Posted: Oct 24, 2023 @ 8:48pm
Posts: 56