itapple53 Jan 22, 2022 @ 4:31pm
Construction office uses manual labour, instread of 3 bulldozers
When I want to build gravel road, сonstruction office uses only workers, It has 3 bulldozer and 3 flatbed trucks, which are staying and doing nothing. Bulldozers were used to build gravel roads, but only these which are really near to CO, but not these, which are a little far. What am I doing wrong
< >
Showing 1-11 of 11 comments
ryantheskinny Jan 22, 2022 @ 4:49pm 
Short road sections don't use machines. Maybe this is the cause?
Last edited by ryantheskinny; Jan 22, 2022 @ 4:49pm
itapple53 Jan 22, 2022 @ 5:20pm 
Originally posted by ryantheskinny:
Short road sections don't use machines. Maybe this is the cause?
How long should the road be, so CO would use bulldozers?
Stele Jan 22, 2022 @ 7:11pm 
At least two shortest node distances long. For pathways it seems shorter than for roads. In construction window, there should me vehicle slot shown or not, if you want to assign workers only to roads that won't get picked up by bulldozers.
MrKrabs Jan 22, 2022 @ 10:24pm 
When you click on the road or footpath which you want to build, and you see an empty small box, then you don't need workers. In the box the bulldozer or excavator will appear once delivered.
misamangame Jan 23, 2022 @ 8:28am 
Originally posted by itapple53:
Originally posted by ryantheskinny:
Short road sections don't use machines. Maybe this is the cause?
How long should the road be, so CO would use bulldozers?
amount of gravel needs to be over 7t
MrKrabs Jan 23, 2022 @ 1:36pm 
Originally posted by misamangame:
Originally posted by itapple53:
How long should the road be, so CO would use bulldozers?
amount of gravel needs to be over 7t

I'm not sure about that.
If I remember correctly I have seen pieces of footpath with less demand of Gravel using machinery.
Stele Jan 23, 2022 @ 2:36pm 
2t footpath can take machinery and is over 2 node distances long. 0.78t path, notdividable, cant use machines. Maybe it isn't a rule, but that lenght is pretty good indication.
misamangame Feb 5, 2022 @ 5:47am 
Originally posted by MrKrabs:
Originally posted by misamangame:
amount of gravel needs to be over 7t

I'm not sure about that.
If I remember correctly I have seen pieces of footpath with less demand of Gravel using machinery.
Yes footpath is much less, but he was talking about roads and it is +7t of gravel needs to be used minimum for machinery use
esbenmf Feb 5, 2022 @ 5:49am 
It needs workers when it shows road work signs at both ends
Last edited by esbenmf; Feb 5, 2022 @ 5:49am
ArielMomo Feb 6, 2022 @ 4:13pm 
On another issue with road construction, is that roads should not be blocked creating a planning nightmare. During construction, roads are not closed, they have one lane available. At least it should be an option, as of now it is not practical to use CO for roads unless you double all the roads.
Railsplitter Feb 6, 2022 @ 7:07pm 
On the construction office dialog, make sure you check the box to deliver equipment by truck. If you don't, the CO will sometimes send excavators and cranes by themselves, which can take forever if the construction project is far away. They travel very slowly.
< >