Construction office uses manual labour, instread of 3 bulldozers
When I want to build gravel road, сonstruction office uses only workers, It has 3 bulldozer and 3 flatbed trucks, which are staying and doing nothing. Bulldozers were used to build gravel roads, but only these which are really near to CO, but not these, which are a little far. What am I doing wrong
< >
Exibindo comentários 111 de 11
ryantheskinny 22/jan./2022 às 16:49 
Short road sections don't use machines. Maybe this is the cause?
Última edição por ryantheskinny; 22/jan./2022 às 16:49
itapple53 22/jan./2022 às 17:20 
Escrito originalmente por ryantheskinny:
Short road sections don't use machines. Maybe this is the cause?
How long should the road be, so CO would use bulldozers?
Stele 22/jan./2022 às 19:11 
At least two shortest node distances long. For pathways it seems shorter than for roads. In construction window, there should me vehicle slot shown or not, if you want to assign workers only to roads that won't get picked up by bulldozers.
MrKrabs 22/jan./2022 às 22:24 
When you click on the road or footpath which you want to build, and you see an empty small box, then you don't need workers. In the box the bulldozer or excavator will appear once delivered.
misamangame 23/jan./2022 às 8:28 
Escrito originalmente por itapple53:
Escrito originalmente por ryantheskinny:
Short road sections don't use machines. Maybe this is the cause?
How long should the road be, so CO would use bulldozers?
amount of gravel needs to be over 7t
MrKrabs 23/jan./2022 às 13:36 
Escrito originalmente por misamangame:
Escrito originalmente por itapple53:
How long should the road be, so CO would use bulldozers?
amount of gravel needs to be over 7t

I'm not sure about that.
If I remember correctly I have seen pieces of footpath with less demand of Gravel using machinery.
Stele 23/jan./2022 às 14:36 
2t footpath can take machinery and is over 2 node distances long. 0.78t path, notdividable, cant use machines. Maybe it isn't a rule, but that lenght is pretty good indication.
misamangame 5/fev./2022 às 5:47 
Escrito originalmente por MrKrabs:
Escrito originalmente por misamangame:
amount of gravel needs to be over 7t

I'm not sure about that.
If I remember correctly I have seen pieces of footpath with less demand of Gravel using machinery.
Yes footpath is much less, but he was talking about roads and it is +7t of gravel needs to be used minimum for machinery use
esbenmf 5/fev./2022 às 5:49 
It needs workers when it shows road work signs at both ends
Última edição por esbenmf; 5/fev./2022 às 5:49
ArielMomo 6/fev./2022 às 16:13 
On another issue with road construction, is that roads should not be blocked creating a planning nightmare. During construction, roads are not closed, they have one lane available. At least it should be an option, as of now it is not practical to use CO for roads unless you double all the roads.
Railsplitter 6/fev./2022 às 19:07 
On the construction office dialog, make sure you check the box to deliver equipment by truck. If you don't, the CO will sometimes send excavators and cranes by themselves, which can take forever if the construction project is far away. They travel very slowly.
< >