SCUM
Problems upgrading base...
Ever since the wipe we have had issues upgrading the floors (not foundations) of our base. Has anyone else run into this issue? We cant upgrade over half the upstairs floors (ceiling pieces both square and triangle). The options to do so are totally grayed out. This is rather frustrating as we always upgrade our base to brick and have been doing so just fine for over 2 years now. =/ It has only been since this most recent wipe that we have had any sort of issues.

We are currently trying to upgrade from twig to wood. All the walls and foundations worked perfectly like normal. It is just the second story "floor" pieces that wont upgrade. There doesnt seem to be a pattern. Both square and triangle pieces are affected and it doesnt seem to be something like say just edge pieces. It is all over, inside (2nd story room with a roof over it) and even outside where the "floor" is just a patio/ceiling to the room below.

Any ideas/help? TIA
Last edited by Miss Murder Mittens; Dec 21, 2024 @ 7:31am
< >
Showing 1-6 of 6 comments
Jolie Rouge Dec 21, 2024 @ 8:26am 
Yep, same here with twig to wood.
CrankyOldMan Dec 21, 2024 @ 10:07am 
Have you tried to place supports under them.

Maybe it is falsely thinking the walls underneath cannot support that floor section and there is a need for additional structural support.

Just a guess.
Miss Murder Mittens Dec 21, 2024 @ 10:32am 
Yes, we did put supports under. That still did not help. Guessing it might be a bug? If so, hopefully it will get fixed soon. I guess for now we will just have to upgrade what we can and leave the rest ugly twig.
CrankyOldMan Dec 21, 2024 @ 10:51am 
A long time ago there was a bug that upgrading some around kinda squeezed the one in the middle.
A way to remedy it was to start at one point and work into one direction, like east to west, north to south.

Start at one point and work way in one direction kinda thing!
Last edited by CrankyOldMan; Dec 21, 2024 @ 10:51am
MS. Green Label Dec 22, 2024 @ 2:06am 
devs are on it and a fix will take some time
Jolie Rouge Dec 22, 2024 @ 4:49am 
Buddy tore down a part of the house by accident and that fixed it too.
< >
Showing 1-6 of 6 comments
Per page: 1530 50

Date Posted: Dec 21, 2024 @ 7:30am
Posts: 6