Install Steam
login
|
language
简体中文 (Simplified Chinese)
繁體中文 (Traditional Chinese)
日本語 (Japanese)
한국어 (Korean)
ไทย (Thai)
Български (Bulgarian)
Čeština (Czech)
Dansk (Danish)
Deutsch (German)
Español - España (Spanish - Spain)
Español - Latinoamérica (Spanish - Latin America)
Ελληνικά (Greek)
Français (French)
Italiano (Italian)
Bahasa Indonesia (Indonesian)
Magyar (Hungarian)
Nederlands (Dutch)
Norsk (Norwegian)
Polski (Polish)
Português (Portuguese - Portugal)
Português - Brasil (Portuguese - Brazil)
Română (Romanian)
Русский (Russian)
Suomi (Finnish)
Svenska (Swedish)
Türkçe (Turkish)
Tiếng Việt (Vietnamese)
Українська (Ukrainian)
Report a translation problem
Since the official Transport Fever 2 Wiki links to this page as the ultimate vehicle information guide, it should be updated for sure. https://www.transportfever2.com/wiki/doku.php?id=gamemanual:vehicles
D 1/3: Cost: $243,884; Running Cost: $40,647; Length: 10.1 m
BR 103.1: Tractive Effort: 312 kN; Length: 19.9 m
Eurodual: Cost: $27,374,772; Running Cost: $4,562,462; Power: 7.000 kW; 22.2 m
TGV: Cost: $58,324,392; Length: 206.6 m
ICE 1: Cost: $69,137,040; Running Cost: $11,522,840; Power: 8,800 kW; Tractive Effort: 400kN; Length: 282.0 m
DUALSTOX: Cost: $41,044,912; Length: 159.1 m
Bilevel car (1988): Max speed: 130 km/h; Length: 26.7 m
Tank car (1850): Cost: $145,652; Running Cost: $24,275; Capacity: 5; Weight: 6 t; Length: 6.7 m