Install Steam
login
|
language
简体中文 (Simplified Chinese)
繁體中文 (Traditional Chinese)
日本語 (Japanese)
한국어 (Korean)
ไทย (Thai)
Български (Bulgarian)
Čeština (Czech)
Dansk (Danish)
Deutsch (German)
Español - España (Spanish - Spain)
Español - Latinoamérica (Spanish - Latin America)
Ελληνικά (Greek)
Français (French)
Italiano (Italian)
Bahasa Indonesia (Indonesian)
Magyar (Hungarian)
Nederlands (Dutch)
Norsk (Norwegian)
Polski (Polish)
Português (Portuguese - Portugal)
Português - Brasil (Portuguese - Brazil)
Română (Romanian)
Русский (Russian)
Suomi (Finnish)
Svenska (Swedish)
Türkçe (Turkish)
Tiếng Việt (Vietnamese)
Українська (Ukrainian)
Report a translation problem
It is an underground high voltage wire going from a power import/export point to a nearby high power switch that i have build,
If you click the "Assign construction" button in the planned construction, it will show you what you need for construction.
R/Tom
Ensure all materials are present and the CO has a source for workers with workers actually waiting there.
It says it needs a tower crane and road crane (optional), and a bus. I have a bus shuttling in foreign workers, they have constructed the high voltage switch, so i think that's covered. To be sure i bought another bus and put it in a construction office (all construction offices are assigned to work on the high voltage wire), but it does nothing.
Still no workers are going to the construction site of the high voltage wire.
I have a road crane in one of the construction offices, it already has done some work on the wires. I purchased a tower crane at the customs building (seems unlikely a tower crane is needed for installation of an underground cable, but i'll give it a shot) - but i have no place to put the tower crane. Do i need a larger construction office for the tower crane?
Thanks, it looks like it's sorted now: i needed to assign the customs house as source for workers (had the bus stop assigned).
Makes sense, i'll keep that in mind when i need the tower crane.