Install Steam
login
|
language
简体中文 (Simplified Chinese)
繁體中文 (Traditional Chinese)
日本語 (Japanese)
한국어 (Korean)
ไทย (Thai)
Български (Bulgarian)
Čeština (Czech)
Dansk (Danish)
Deutsch (German)
Español - España (Spanish - Spain)
Español - Latinoamérica (Spanish - Latin America)
Ελληνικά (Greek)
Français (French)
Italiano (Italian)
Bahasa Indonesia (Indonesian)
Magyar (Hungarian)
Nederlands (Dutch)
Norsk (Norwegian)
Polski (Polish)
Português (Portuguese - Portugal)
Português - Brasil (Portuguese - Brazil)
Română (Romanian)
Русский (Russian)
Suomi (Finnish)
Svenska (Swedish)
Türkçe (Turkish)
Tiếng Việt (Vietnamese)
Українська (Ukrainian)
Report a translation problem
Build your own beltlimit.
You can rate-limit your belts as soon as you can make splitters and mergers; spilt a 60/minute belt into two lines, feed one of them into a merger before the splitter, et voila: 30/minute belt.
That's the most simplistic example, but nothing is stopping you from building multiples on the same line, splitting and recombining lines until you have any number of items per minute on the belt that your heart desires.
Step 1: Do the math.
Step 2: Build the things.
Step 3: ???
Step 4: Profit!
Post-script:
It should be noted that one can use conveyor lifts between splitters/mergers, instead of belts. "Use verticality".