Schedule I

Schedule I

View Stats:
Workers mixing multiple items?
Is it possible to have the workers mix multiple items to make a good strain or can they only mix 1 item. I cant seem to figure out how to do it they only mix 1 item then put it away.
< >
Showing 1-2 of 2 comments
You can if you have multiple mixing station. Basically you set the output destination of your mixing station to the next mixing station and so on. You also need to set handlers to put the ingredients (cuke, gas, donut etc.) in each mixing station. Easier to set if you have the bigger properties. Smaller ones are difficult but I think it's doable for the bungalow.

Note that each chemist can only be assigned up to 4 stations and each handler can only be assigned up to 5 transport routes.
Yes you can absolutely, say you want to make a fully automated 8 mix production line (for this example weed with 24 plants).

You'll need the following:
4 Botanists
2 Handlers
2 Chemists

Botanist roles:
3 Botanists - Assigned to 8 plants each
For the each plant pot define the seed, addictive and make destination to drying rack (think 3 plant pots to 1 drying rack)
Set source to a shelf defined for all the required ingredients (I.e. 2 Stacks of soil, 3 stacks of seeds and 3 stacks of fertilizer if used, if not just 6 stacks of seed)

1 Botanist - Assigned to 8 Drying racks
For drying racks define the quality and set destination to mix station 1

Chemists:
2 Chemists - Assign each chemist 4 mixing station
NOTE: Do not assign one chemist to mixing station 1, 2, 3, 4 and the other to 5, 6, 7, 8. Instead assign Chemist1 to 1, 3, 5, 7 and the other to 2, 4, 6, 8
Set the destination of each mixing station to the next in the production line and for mixing station 8 set the destination to packaging station

Handlers:
2 Handlers - Required to stock mixing station
Handler1 - Storage rack1 (holds 1st mix) to Mixing station1, Storage rack2 (holds 2nd mix) to Mixing station2, etc up to 4

Handler2 - Storage rack5 (holds 5th mix) to Mixing station5, etc up to 8
Also assign to Package station and add final route for
Empty jar/bag storage rack to package station

Set package station destination to final storage rack for end product

That should now work fully automated with 8 mixes in your product. Any questions feel free to ask and ill explain more.
Last edited by Mattoreous The Great; Apr 15 @ 3:47am
< >
Showing 1-2 of 2 comments
Per page: 1530 50

Date Posted: Apr 15 @ 3:28am
Posts: 2