Train Sim World® 5

Train Sim World® 5

View Stats:
Bug In Refreshing Refurb Euston -, Milton Keynes Scenario?
I've just attempted for about the 5th time to complete the Refurbishing Refresh Scenario on WCML South.

You have to take an empty train from Wembley to Euston then change ends and drive it to Watford Junction where you're supposed to meet another Pendolino which I did.

However it didn't tell me to shut my cab down on arrival. So it's not completed correctly.

How am I supposed to complete it? I've watched videos and it should tell you to shut the cab down but it doesn't.
Last edited by pgraham87015; Feb 10 @ 6:23pm
< >
Showing 1-4 of 4 comments
I just got the Class 390 DLC and had a similar issue with that scenario. I arrived at Watford Junction without problems, but the scenario got stuck after it asked to close the doors. I did as instructed, but the scenario didn't progress into the cab shutdown. It just kept telling me to close the doors no matter what I did.
dougsie Feb 11 @ 5:05am 
It is because you did not arrive at Watford Junction at exactly the same time as the southbound Pendolino ( which is what is expected of you) and there is a message to tell you this.

After not meeting your goal the scenario goes off in disgust (muttering something about HR issuing P45's to useless drivers) leaving you in limbo.

Edit: I have yet to succeed because the southbound is already in the station each time I get there.
Last edited by dougsie; Feb 11 @ 5:13am
Originally posted by dougsie:
It is because you did not arrive at Watford Junction at exactly the same time as the southbound Pendolino ( which is what is expected of you) and there is a message to tell you this.

After not meeting your goal the scenario goes off in disgust (muttering something about HR issuing P45's to useless drivers) leaving you in limbo.

Edit: I have yet to succeed because the southbound is already in the station each time I get there.

When I played it last time I arrived at the platform at the same the Southbound train was arriving at the platform. It actually said it was good timing the objectives have been met. Even if I hadn't succeeded at arriving at the same time it should have ended the game. It's supposed to say park the train and shut down the cab and we'll see how you got on,
dougsie Feb 11 @ 7:52am 
Originally posted by pgraham87015:

When I played it last time I arrived at the platform at the same the Southbound train was arriving at the platform. It actually said it was good timing the objectives have been met. Even if I hadn't succeeded at arriving at the same time it should have ended the game. It's supposed to say park the train and shut down the cab and we'll see how you got on,

So far you are doing better than I am. Shame it didn't respond.
< >
Showing 1-4 of 4 comments
Per page: 1530 50

Date Posted: Feb 10 @ 6:20pm
Posts: 4