Recycling Center Simulator

Recycling Center Simulator

View Stats:
Uneven machines
I'm trying to connect all tiers of machines together. Where Ill have production of every item eventually. But some of the machines are different sizes, so I cant connect with conveyors. Im trying to split off tier 1 materials to storage and send the other half to a tier 2 machine, then split off half for storage and send to next machine. How can I fix this?
< >
Showing 1-15 of 24 comments
VMB-TAN Mar 29 @ 10:48am 
Start from the end of the line and work your way back to the first machine.
Originally posted by VMB-TAN:
Start from the end of the line and work your way back to the first machine.
Man, that sounds dreadful but I think youre right lol
EDIT: Not sure how I can work backwards, because my conveyors seem to only attach to the front of the conveyor in front of it :(
Last edited by Tom Nook (he/him); Mar 29 @ 10:51am
After a little testing it seems I cannot do it the way I want to do it. Some of the T1 machines are uneven, some of the T2 and T3 are also uneven. Which means they cant go on the same conveyor system with the other machines, which negates the streamlining Im trying to do unfortunately
EDIT: Its the paper and wood machines that have different sizes to the rest.
Last edited by Tom Nook (he/him); Mar 29 @ 11:03am
Shane Mar 29 @ 11:26am 
its the tier 2 wood machine that is a different size to the others
Originally posted by Shane:
its the tier 2 wood machine that is a different size to the others
Paper T2 is also different than the rest of the T2 machines
Shane Mar 29 @ 11:30am 
never noticed the paper one, but the wood one is deffo different size
Shane Mar 29 @ 11:32am 
when i set up my production line i used the wood machines as the meaqsurement so the paper one must be smaller than the wood machines right ?
I at least got metal plastic and glass working and sends T1 and T2 materials on the same conveyor to storage!
Originally posted by Shane:
when i set up my production line i used the wood machines as the meaqsurement so the paper one must be smaller than the wood machines right ?
I didnt measure them together, but theyre both off by a little bit. Even if I use the wood as template, i still dont know how to connect the rest because theres a half conveyor belt difference. How do you fix this?
Shane Mar 29 @ 11:41am 
build from the final end of production backwards
Originally posted by Shane:
build from the final end of production backwards
I tried that as VMB-TAN mentioned, but it still doesnt work for me. It seems to work great if none of the machines are connected together other than the same colour. I need all the T1 machines connected to the same conveyor belt, same as all the T2 machines and T3 machines. Im starting to think its not possible :(
Shane Mar 29 @ 11:46am 
oh if your trying to do all tier1 machines on the same belt thats different...
i dont do that...
Originally posted by Shane:
oh if your trying to do all tier1 machines on the same belt thats different...
i dont do that...
I wanted to do it to unlock the certificates, since it requires so much. I thought it would be a great introduction to the games conveyor system. I guess not haha
Shane Mar 29 @ 11:53am 
i have my lines setup merely in a fashion its possible to produce and direct any type of product to a separate location if required but i only really produce hybrid products

what certificates ?
For the hybrid machines
< >
Showing 1-15 of 24 comments
Per page: 1530 50