Iddor88 Nov 16, 2024 @ 3:59am
Planning the first house mission
Hi there, Im new to the game so still discovering a lot.

Like it a lot so far but I have some troubles while planning my first house building mission.
When Im in the container and in the planning modus, I can't seem to place a stairs. The logo is on the left but its dark grey and when I click it, nothing happens. I have to build a one floor house, so a staircase is needed...

Also when I erase a inside wall the little squares stay lichtgrey but after that I cant place anything else on that same spot only a outside wall. Same when eraseiing a door, cant place a new inside wall on that same spot.

Am I missing something?

Kind regards
Originally posted by Berkay B:
Originally posted by Iddor88:
Hi there, Im new to the game so still discovering a lot.

Like it a lot so far but I have some troubles while planning my first house building mission.
When Im in the container and in the planning modus, I can't seem to place a stairs. The logo is on the left but its dark grey and when I click it, nothing happens. I have to build a one floor house, so a staircase is needed...

Also when I erase a inside wall the little squares stay lichtgrey but after that I cant place anything else on that same spot only a outside wall. Same when eraseiing a door, cant place a new inside wall on that same spot.

Am I missing something?

Kind regards

Thank you for reaching out with your questions regarding the planner and building requirements. To clarify, when the mission specifies Floor Count: 1, it indicates that the house is limited to just the Ground Floor. Therefore, stairs are not necessary and will be unavailable in the planner.

Regarding erased elements, if you remove a section, you may need to restore the floor (represented by dark gray squares in the grid) to the erased spaces (which appear as white squares) to make them available again for assigning other elements such as rooms, doors, or windows.

We recommend visiting the #planner-designs channel on the ContractVille Official Discord Server[discord.com]for further guidance and examples. There, you can share screenshots of your layout, receive personalized advice, and view designs from other contractors, which can be incredibly helpful.

Additionally, the Guide Book accessible from your in-game tablet offers step-by-step instructions on planning and resolving layout-related errors. If you need a refresher on the game's mechanics, you can also reset and revisit the tutorials through the Gameplay settings in the options, giving you a clearer understanding of the planning process.

If you have further questions, please don’t hesitate to reach out. We’re committed to ensuring your gaming experience is smooth and enjoyable!
< >
Showing 1-2 of 2 comments
Funny Smile Nov 16, 2024 @ 6:45am 
Originally posted by Iddor88:
Hi there, Im new to the game so still discovering a lot.

Like it a lot so far but I have some troubles while planning my first house building mission.
When Im in the container and in the planning modus, I can't seem to place a stairs. The logo is on the left but its dark grey and when I click it, nothing happens. I have to build a one floor house, so a staircase is needed...

Also when I erase a inside wall the little squares stay lichtgrey but after that I cant place anything else on that same spot only a outside wall. Same when eraseiing a door, cant place a new inside wall on that same spot.

Am I missing something?

Kind regards

1) A single-story house is built without a staircase
2) to build something you need to click on the gray tile called floor and select the desired area so that it becomes unassigned and already there make a wall either external or internal and already based on these walls put doors or windows!
A developer of this app has indicated that this post answers the original topic.
Berkay B  [developer] Nov 18, 2024 @ 1:04am 
Originally posted by Iddor88:
Hi there, Im new to the game so still discovering a lot.

Like it a lot so far but I have some troubles while planning my first house building mission.
When Im in the container and in the planning modus, I can't seem to place a stairs. The logo is on the left but its dark grey and when I click it, nothing happens. I have to build a one floor house, so a staircase is needed...

Also when I erase a inside wall the little squares stay lichtgrey but after that I cant place anything else on that same spot only a outside wall. Same when eraseiing a door, cant place a new inside wall on that same spot.

Am I missing something?

Kind regards

Thank you for reaching out with your questions regarding the planner and building requirements. To clarify, when the mission specifies Floor Count: 1, it indicates that the house is limited to just the Ground Floor. Therefore, stairs are not necessary and will be unavailable in the planner.

Regarding erased elements, if you remove a section, you may need to restore the floor (represented by dark gray squares in the grid) to the erased spaces (which appear as white squares) to make them available again for assigning other elements such as rooms, doors, or windows.

We recommend visiting the #planner-designs channel on the ContractVille Official Discord Server[discord.com]for further guidance and examples. There, you can share screenshots of your layout, receive personalized advice, and view designs from other contractors, which can be incredibly helpful.

Additionally, the Guide Book accessible from your in-game tablet offers step-by-step instructions on planning and resolving layout-related errors. If you need a refresher on the game's mechanics, you can also reset and revisit the tutorials through the Gameplay settings in the options, giving you a clearer understanding of the planning process.

If you have further questions, please don’t hesitate to reach out. We’re committed to ensuring your gaming experience is smooth and enjoyable!
Last edited by Berkay B; Nov 18, 2024 @ 1:09am
< >
Showing 1-2 of 2 comments
Per page: 1530 50

Date Posted: Nov 16, 2024 @ 3:59am
Posts: 2