Railroader

Railroader

LionkingCMSL Mar 5, 2024 @ 11:50am
Signals to Alarka?
I was wondering if there will be a milestone to have signals from Alarka Jct. to Alarka, even if not prototypically correct. They could be all automatic with no CTC involvement.

If not then could the signals for the branch allow track speed after clearing the junction? It seems odd to have trains crawl towards Alarka at 15mph when track speed is 25mph.
Last edited by LionkingCMSL; Mar 5, 2024 @ 11:51am
< >
Showing 1-4 of 4 comments
Omogoto Mar 5, 2024 @ 12:35pm 
I had an issue the other day at this location. I had a AI train train heading to Bryson on the main line just as it was supposed to pass Alarka Jct. it stopped due to the "red board" message? There is a set of signals on the branch line heading to Alarka Depot, but there was no other train in the area, and I am assuming the two signals were red for a train leaving the branch line and the signal was green for the mainline. It was like my mainline train "saw" the red board on the branch line even though the signal was green and open heading to Bryson?
Oilman25 Mar 5, 2024 @ 2:02pm 
The game developers has pull the milestone for Alarka branch line signals and but are thinking of putting them back into the game at some point.
Horsa Mar 5, 2024 @ 2:55pm 
I have found some glitches with existing signals so I am not surprised there are issues with the Alarka extension. The route otherwise is simply A to B.
DorniNerd  [developer] Mar 7, 2024 @ 6:31am 
It is something we are working on, a known issue, thanks!
< >
Showing 1-4 of 4 comments
Per page: 1530 50

Date Posted: Mar 5, 2024 @ 11:50am
Posts: 4