Garry's Mod
Członkostwo od:
February 2, 2007
Czas grania:
108.9 godzin w ciągu minionych 2 tygodni
Half-Life 2: Deathmatch
4.1 godz. / 105 godz.
Half-Life: Source
1.1 godz. / 1.1 godz.
Profil Steam
Luke-NAESA®
Profil _
Owner And Proud Operator Of NAESA®
Luke
United Kingdom (Great Britain) 
Luke NAESA.
Processor Information:
Vendor: GenuineIntel
Speed: 3482 Mhz
4 logical processors
4 physical processors
HyperThreading: Unsupported
FCMOV: Supported
SSE2: Supported
Network Information:
Network Speed:
Windows Version:
Windows Vista (32 bit)
NTFS: Supported
Video Card:
Driver: NVIDIA GeForce 8800 Ultra
DirectX Driver Name: nvd3dum.dll
Driver Version: 7.15.11.8208
DirectX Driver Version: 7.15.11.8208
Driver Date: 18 Feb 2009
Desktop Color Depth: 32 bits per pixel
Monitor Refresh Rate: 75 Hz
DirectX Card: NVIDIA GeForce 8800 Ultra
VendorID: 0x10de
DeviceID: 0x194
Number of Monitors: 2
Number of Logical Video Cards: 2
No SLI or Crossfire Detected
Primary Display Resolution: 1680 x 1050
Desktop Resolution: 2960 x 1050
Primary Display Size: 23.35" x 14.57" (27.48" diag)
59.3cm x 37.0cm (69.8cm d
Primary Bus: PCI Express 16x
Primary VRAM: 768 MB
Supported MSAA Modes: 2x 4x 8x
Sound card:
Audio device: Speakers (SoundMAX Integrated D
Memory:
RAM: 3326 Mb
Miscellaneous:
UI Language: English
Microphone: Not set
Media Type: DVD
Total Hard Disk Space Available: 715401 Mb
Largest Free Hard Disk Block: 362034 Mb
Steam Hard Disk Usage: 25231 Mb
OS Install Date: Mar 11 2009
Komentarze _
Grupy _
National Aeronautics European Space Administration (NAESA) - Publiczna
NAESA® Inspiring Your Imagination (NAESA)
© 2009 National Aeronautics European And Space Adminstration.
Welcome to the National Aeronautics European Space Administration, (NAESA).
One of the most expansive, determined SB Groups on Steam.
We are currently seeking members. Releasing a new map, one version is released already and has achieved over 5000 downloads.
We're hoping to use the command and lunar modules for the second mission. To successfully land on an extra-terrestrial body.
The ship will designed in mind of carrying a couple a hundred pounds of rocks back to Earth with it. Without this weight, the ships balance will topple. And it won't be able to make it back into the atmosphere, and the mission will fail.
Ships are built, to the highest standard possible. Carry backup supplies of well required resources at all times. To ensure the safety, and smoothness of the onboard crew and the mission itself.
Geographics on the planets indicate the ship will require MASSES of temperature supporting devices and Liquid Nitrogen to stop the cabin's inhabitants from combusting.
Backup plans are required, because if something goes wrong onboard it's the Mission Control's job of getting things back in order, and working again. Or providing information onto how to get the craft safely back to Earth.
To sum up this feat. The next mission will take place on Sat. 7th April 2009 @ 5:00PM GMT.
Thank you for reading this ~ Luke-NAESA®.
Zobacz profil użytkownika National Aeronautics European Space Administration (NAESA)
Wyświetl wszystkie grupy 12